First empennage box arrives!

Woohoo! Box 1 of the empennage arrived. That was fast. Helps to live only 200 miles from the factory. My first words were, “Is that it?” It’s a very small and unimpressive box. However, inside they’ve really packed a lot in there. (Everything was wrapped in paper. I removed it for the picture.) Lots of little bags of tiny parts. And lots of little aluminum pieces stacked inside each other. Somebody has definitely thought about the best way to package this stuff so it doesn’t get damaged along the way. The box was smashed a bit on one side, but I couldn’t see any damage to the contents. Hopefully box 2 arrives tomorrow. The Cleaveland tools are set to arrive on Monday according to UPS.
image 2616

I still need to get a bench grinder, tool chest, air lines, particle board, and some parts organizers. I also need to organize the last of the junk on the bench and get the rest of the other junk out of the garage. And I need to buy and install a new utility sink (the old one was incredibly small). And finish up a couple of non-RV projects (mainly installing a bathroom fan). I am totally excited about diving into this project.

Comments are closed.