Archive for June 2004

Right leading edge prep

Sunday, June 20th, 2004

I was going to dimple everything for the right leading edge and get the ribs ready for another primer session. I got 1/2 hour into it and got too hot. Went swimming instead.

Right tank rib sealing

Sunday, June 20th, 2004

Second sealing session done with Julie’s help. Riveted in two ribs. I was hoping to get three done, but the sealant started setting up after just 45 minutes. This is the first tube of the next batch that I ordered. It seems to be setting up much faster. It’s also 80F in the shop. I’m sure that’s not helping. For the next session, I think I’ll try not mixing in all of the hardener and/or putting the sealant gun in some ice water to keep it cool.

Julie pointed out the odd coincidence that we always seem to be ProSealing on special occasions, my birthday, Mother’s Day, and now Father’s Day. What better way to celebrate a special occasion, eh?

Right leading edge rib prep

Saturday, June 19th, 2004

Disassembled right leading edge. Deburred leading edge ribs.

Right tank stiffener sealing

Saturday, June 19th, 2004

Completed the first sealant session on the right tank. I back-riveted on the stiffeners, back-riveted the filler flange (with better luck than with the other tank), squeezed on the drain flange, and attached the tooling hole cover and nose reinforcement to the outboard rib. Pretty productive session.
image 3385 image 3386

I also dabbed some sealant through the filler hole on the left tank to try to cure the slow leak. Made kind of a mess of it, but it’s all inside. Nobody will see it. Hopefully that took care of the leak.

It ended up being 80F by the end of the session. If this keeps up, I’m going to need an air conditioner for the garage.

Right tank sealing prep

Friday, June 18th, 2004

The plan was to do the first session on the right tank after work. I washed the last of the miscellaneous parts and the ribs. Scuffed the remaining parts (filler flange, drain flange, etc.). Cleaned everything with MEK, including the rivets. Put down electrical tape where I didn’t want sealant. Got all of the tools ready. By the time all of that was done, it was dinner time. It’s amazing how long the prep takes, even when I think I have everything ready.

After dinner, Julie wanted to go to Home Depot. After that, it was getting too late. Plus it was still 80 in the garage. It’s been way too hot here the past few days.

Right tank scuffing

Thursday, June 17th, 2004

Not much progress lately. Lots of end of school year stuff and a soccer game and swim meet, etc.

I did manage to scuff up the sealing surfaces on the right tank ribs.

Right tank access ring

Monday, June 14th, 2004

Did just a short session. Riveted the access cover reinforcement ring and plate nuts for the right fuel tank. Didn’t use sealant for this on the other tank, so didn’t use it here either. The instructions say it isn’t necessary, and I agree with that.
image 3382

At this point, I just have to scuff the ribs and deburr and scuff the baffle. Then everything is ready to go for this tank. I just have to find 2-3 hour blocks of time for doing ProSeal. Might be tough this week. Lots of other stuff going on. At least all of the parts are organized and ready to go.
image 3384

Right tank prep

Sunday, June 13th, 2004

Did a ton of work on the right fuel tank today. Deburred and dimpled the rest of the tank ribs. Trimmed and deburred the capacitive plates and attached nut plates to them. I had screwed up one of the coax connectors on the other tank, so I ordered another one a week ago for this tank. I soldered that to a piece of wire. I attached the other wire to the outboard capacitive plate.

Drilled, deburred, and countersunk the drain and fuel cap ring.
image 3374 image 3376 image 3379

Drilled and deburred the access plate and reinforcement ring. Dimpled the rib and countersunk the access ring. Dimpled the skin and deburred the edge. I used the C-frame to dimple the #8 screw holes. We’ll see if that helps the skin sit more flush. Scuffed the inside of the skin where things are attached. Scuffed the stiffeners.
image 3380

I was hoping to do the first ProSeal session today, but realized that I’m out of time and energy. I thought at least the tanks were completely ready to go. And then I noticed the baffle sitting in the corner. Still need to debur that. At least I won’t need it for a while.

Tons of parts almost ready to go.
image 3381

Goofy self-portrait from the photographer.
image 3378

Right tank deburring

Friday, June 11th, 2004

Deburred the outside of the right fuel tank skin. Deburred and dimpled the tank stiffeners and half of the tank ribs. Drilled the capacitive senders, tank attach bracket, and nose doublers to the appropriate ribs. I’m haulin’. The sooner I get through this tank, the better.

Right tank stiffener drilling

Thursday, June 10th, 2004

Countersunk the right fuel tank skin to baffle holes. Disassembled the tank. Drilled the fuel tank stiffeners to the skin. Deburred the inside of the tank skin.
image 3373

I realized that I haven’t been taking many pictures lately. Not much new to see the second time around.

I’m still quite happy that I fabricated all of the parts in pairs. The stiffeners are all ready to go. The tank attach bracket is all cut out. The tip doublers are all deburred. Saves a lot of time on the second wing.